TermAbbreviationNOTES / DEFINITION
Additional requirementARSupplementary requirement for which there is no equivalent within an SHW or IfS document
Cancelled requirementCRRequirement within an SHW or IfS document that has been cancelled or deleted.
Contract documentsSet of documents containing the works information, conditions of contract and pricing documents.
Contract Specific AppendixAppendix given in the old MCHW at the end of each Notes for Guidance document, providing advice for the compilation of the contract-specific specifications (now replaced by the Works Specific Requirements templates).
Country-specific versionVersion of a relevant SHW, IfS and WSR template specific to a relevant Overseeing Organisation, downloadable from the Standards for Highways website.
Design Manual for Roads and BridgesDMRBDocument set containing the Overseeing Organisations’ Organisations’ requirements and advice for planning, design, inspection, assessment, maintenance, operation and disposal of the Overseeing Organisations’ motorway and all-purpose trunk roads.
Departure from standardFormal approval mechanism for works on the Strategic Road Network that do not comply with the standards. Uses include undertaking value engineering, making innovations, or if requirements cannot be met otherwise.
ElementContract-specific items identified to break and organise the content into specific components and facilitate the organisation of tasks and sub-tasks (defined at designer’s team discretion as done in the past).
Highway Construction DetailsHCDSet of standard drawings provided in the old MCHW under Volume 3.
Instructions for SpecifiersIfSDocument set contained in the MCHW providing instructions to the Specifier on the inclusion of contract specific requirements using Works Specific Requirements (WSR) templates. The IfS documents also replicate the SHW constructor requirements within their texts to aid the compilation of the contract-specific requirements.
Manual of Contract Documents for Highway WorksMCHWDocument set that contains information to facilitate the production of works specifications for the construction of the works.
Updated MCHW: indicates the version published in September 2025.
Old / former MCHW: indicates previous versions.
Method of Measurement for
Highways Works
MMHWDocument set contained in the MCHW providing the methods of measurement to be used for the preparation of bills of quantities
National alterationTerm used to indicate specific rules of the Overseeing Organisations contained in the old MCHW (now replaced by the national variations presented as Nationally Determined Requirements and Nationally Determined Sections).
Nationally Determined RequirementNDRIndividual requirements presented within the main text of a relevant SHW / IfS document (relevant when there is small variation between OOs’ requirements).
Nationally Determined SectionNDSAd hoc sections introduced in the main text of a relevant SHW / IfS document (relevant when there is significant variation between OOs’ requirements).
Notes for GuidanceNfGSet of documents provided in the old MCHW under Volume 2, which was used for the preparation of the contract specific specifications, including the Contract Specific Appendices (now replaced by the Instructions for Specifiers documents).
Operational Technology Standards LibraryOTSLStandards covering operational technology requirements and advice relating to works on the UK motorway and all-purpose trunk roads (formerly TSS Plans Registry)​.
Overseeing OrganisationsOONational Highways and the highways or roads authorities of Scotland, Wales and Northern Ireland and their successors.
Requirement and Advice DocumentRADCollective term for the DMRB and associated National Application Annexes, MCHW and associated SHW, IfS, MMHW and WSRs.
Road Investment StrategyRISFive year DfT strategy for investment in and management of the UK strategic road network. RIS2 refers to the period April 2020- March 2025.
Specification for Highway WorksSHWDocument set contained in the MCHW providing constructor requirements for the implementation of highway works, to be used as the base specification in highway contracts. This only shows constructor requirements.
SpecifierThe party compiling the contract specification (this term replaces the term “Compiler” used in the old MCHW).
Specifier instructionSIInstruction providing the required works specific requirements related to the constructor requirements.
Standards for Highways websiteSfHWebsite managed by National Highways on behalf of the four Overseeing Organisations.
Substitute requirementSRRequirement that replaces an existing requirement within an SHW or IfS document.
Technical Standards GroupTSGNational Highways team responsible for the process of developing and publishing RADs.
Works informationAlso called “contract scope” in NEC terms. This is given by the works specification content, the contract drawings and other content like quality documents, environmental content, etc.
Works Specific RequirementsWSRWorks specific content to be used in conjunction with SHW constructor requirements for the particular scheme/project. New WSR templates are provided.
Works specificationAlso called “contract specification”. Set of requirements dealing with the works, which can include requirements on geometry, constructor design, performance, activities, verification, documentation submission and limitations of construction activities.